[The threads are unfortunately not all done yet, since December = annual accounts = weeks from hell at my job, but everything in this has been plotted out oocly with the players, and the reports have been read and okayed by all of them as things found out via IC interaction and observation between days 71 and 74. Hope I'm doing this right, sob.]
DAY 75
ASSIGNMENT: ORANGE TEAM
Reports in the attachment, sir.
[ ATTACHMENT: M02-B25-514_report_orange-team.epxs ]
[The threads are unfortunately not all done yet, since December = annual accounts = weeks from hell at my job, but everything in this has been plotted out oocly with the players, and the reports have been read and okayed by all of them as things found out via IC interaction and observation between days 71 and 74. Hope I'm doing this right, sob.]